Production Tooling Handoff
Prepare the drawing, sample, inspection and tool-interface records needed to move from prototype tooling to production planning.
Freeze the baseline for production review
Gather the approved drawing revision, resin and finish reference, accepted samples and open issues. Record any differences between the prototype tool and proposed production tooling, especially where they can change appearance or assembly fit.
Agree tooling and receiving interfaces
If the tool is to run on a different press or transfer to a receiving plant, request the press interface and required documentation. Confirm what drawings, spare parts, inspection records and maintenance notes are included in the handoff.
Plan what needs to be repeated
Changes to material, cavity layout, gate location or equipment may alter results from the sample trial. Identify the checks affected by each change and agree the release conditions before scheduling a production run.
Frequently asked questions
Does prototype approval automatically release production tooling?
Review changes to the part, tool, material and process first. The production plan should identify what is covered by prior evidence and which checks require new samples.
What should a receiving plant provide for mold transfer review?
Provide press interface details, any plant tooling requirements and the documents needed for setup, acceptance and maintenance. Agree transfer scope and responsibilities with the parties involved.